top of page

New King Abdulaziz International Airport- Jeddah, Saudi Arabia (28 Billion SAR)

The project is a design-built project that covers an area of 670,000 square meters for the new terminal that will accommodate 30 million passengers annually. The terminal has 46 air bridges, 200 counters, 54 takeoff lounges for international passengers and 28 for domestic passengers and 4 for VIPs in addition to six baggage collection centers for domestic passengers and 10 for international passengers. Its commercial region will have 118-room hotel. Inside the terminal there is an automated passenger mover that will transfer the passengers through the terminal in addition to the 114 escalators and 66 moving walks. This in addition to the world’s tallest air traffic control tower at 130 meters, parking lot to accommodate 8,200 vehicles, three power generation and cooling centers, data administration centers, infrastructure and road network. The structure for the terminal and other facilities is a combination of concrete and structural steel with external façade covered with aluminum glazing and precast panels and roof cover consisting of Kalzip system.
bottom of page